On 03.12.2018 Bulkraft Ltd. signed a contract No. BG16RFOP002-3.004-0041-C01 for grant funding as per the Operational Programme „Innovation and Competitiveness” 2014-2020, procedure BG16RFOP002-3.004 “Support for pilot and demonstration initiatives for increase the efficient use of resources”.

Name of the project: Improvement of resource efficiency in Bulkaft Ltd. 

Period: 20 months. 

Project cost: 1 891 784.45 BGN, 754 853.78 BG of which self-financing. 

Purpose of the project: The main purpose of the project offer is the increase  of resource efficiency of Bulkaft Ltd. with implementation of pilot technological solutions (used for first time in Bulgaria), which to overcome the limits of the technologies used in production so far and to improve the resource efficiency of the production processes.In relation to that Bulkaft Ltd. announces a procedure for contractor selection with subject: “Delivery of high efficient equipment for metal surface cleaning before the application of anti-corrosion coating with the methods of wet blasting: Complete system for wet abrasive blasting.”

All the documents related to the procedure could be read here.

Replies to questions/inquiries related to the procedure.




Dear Clients/Partners, 

We are happy to announce that in June 2016 Bulkraft Ltd. signed a Contract BG16RFOP002-2.001-0717-C01 for grant funding for execution of a project with subject “Modernization of production processes in Bulkaft Ltd.”. The project is funded by the Operation programme “Innovation and Competitiveness” 2014-2020 as part of procedure BG16RFOP002-2.001 “Improvement of production capacity of SME “. The total cost of the project is 940 000 BGN, 564 000 BGN   as grant funding, 479 400 BGN European funding provided by the European Fund for regional Development and 84 600 BGN is nationally co-financed. Main purpose of the project is obtaining sustainable growth of Bulkraft Ltd through increase of the competitiveness and improvement of company production efficiency. The project investment covers equipment used for application of anti-corrosion coating on metal surfaces. It includes:

Hydraulic scissor platform – 1 pc,

Hydraulic platform – 1pc, 

Vacuum apparatus – 2 pcs, 

Water blasting machine – pcs, 

Air-dryer and air-heater – 2pcs, 

Pneumatic painting pump – 4 pcs, 

Pneumatic diaphragm pump – 4 pcs,

Sand blasting apparatus – 12pcs, 

Forklift – 1 pc


The project investment main purpose is to obtain a synergy effect in several directions:– optimization of production processes, improvement of products quality, improvement of international and national market positions, increase of sales – to current and identified potential clients. Thus it will result in increase of competitiveness and profitability of the company for a long period of time as well as in improvement and development of competitiveness of the Bulgarian economy as a whole 

Period of the project: till 27.12.2017 

Bulkraft Ltd.

Tender documents for contractor selection process